Welcome to CaliforniaWelcome to CaliforniaWelcome to California
 
Username Password Forgot Password
 



This is the third phase of the EEGA 2006 deployment, which allows for the utilities to submit monthly and quarterly reports to CPUC, and for all users, including the general public, to download the reports and view up-to-date information on energy savings. The next release of EEGA 2006 is scheduled for November which will include  improved reporting capabilities.

 
 
   
Energy Efficiency 2006-08 Verification Report and Appendices
 
Settlement Analysis in Response to 9-16-09 Workshop
VRT_Settlement_Results_v.02.zip (520 KB) 1 

VRT_Settlement_v.02.zip  (552 MB) 1 


Verification Settlement
Energy Division Analysis of RRIM Settlement_v.02.doc (64 KB) 1 

VRT_settlement.zip  (1.18 GB) 1

VRT_Settlement_Results.zip  (115 KB) 1 


2nd Final Verification Report
VRT2_PostToEEGA\Appendix_R_Additional_Documentation_2nd_VerificationReport.zip (824MB) 1 


Final Verification Report Files
CoverPage_EE_Verification_Report_020509.pdf (.25MB)  

EE_Verification_Report_Final_020509.pdf (.7MB)  

Appendix D_v.02_04-05 Lifecycle Evaluation Impact Tables_2-4-09.xls (1MB)  

Appendix O CompleteVRT.exe (330MB)    

Appendix P_DVR_Comments.zip (1MB)  

Appendix Q DEER responses.zip (3MB)  

RRIMcalcs Updated 2-4-09.zip (.2MB)  


Draft Verification Report Files>
Draft Energy Efficiency 2006-07 Verification Report and Appendices (83MB). Self extractable file that contains the Draft Energy Efficiency 2006-07 Verification Report with Appendices A through N. Contains the final VRT database and RRM Calculations spreadsheet.  

Nov 19 Errata to the 2006 - 2007 Verification Report (300KB). Self extractable file that contains the Nov 19 Errata to the 2006 - 2007 Verification Report. Includes updated RRMCalculator with revised penalty formulas. 


 
© 2008 Designed, developed and maintained by Intergy Corporation 
1 Documents and information may be served from shared hosting to which the CPUC contributes.